A SAR 131.4M contract for National Grid SA. A high-voltage substation with a full mechanical scope, where civil, electrical and mechanical works intersect on a single schedule that cannot absorb slippage.
What was delivered
- —Led delivery of the full mechanical scope: HVAC, firefighting and suppression, and plumbing networks.
- —Managed precast concrete design adjustments in coordination with the civil teams.
- —Supervised heavy overhead crane installation and industrial security system integration.
Outcome
- 131.4M
- Contract value, SAR
- 110/33
- kV
Mechanical construction inside one of the largest Vision 2030 programmes. The environment applies pressure from two directions at once: a hard schedule, and specifications that leave no room for rework.
What was delivered
- —Managed the project’s mechanical construction, quality follow-up and cross-discipline coordination.
- —Tightened the approval and inspection cycle to prevent rework rather than absorb it.
Outcome
- 95%
- Completion on schedule
- 10%
- Under budget
- 20%
- Rework reduction
- 15%
- Team productivity gain
Nine specialized industrial storage tanks to GB standards, on an industrial site where safety is a condition of continuing rather than a line in a report.
What was delivered
- —Supervised construction and testing through handover, and managed the safety and quality audit.
- —Mentored junior engineers and lifted team efficiency through resource management.
Outcome
- 9
- Industrial tanks
- 100%
- Safety & quality audit compliance
- 12%
- Cost reduction
- 18%
- Team efficiency gain
482 Residential Villas — Dammam & Al-Khobar
Senior Mechanical Engineer & HSE Manager
Fanar Arabian International / Pace Consulting · Oct 2020 — Aug 2021
232 villas in Dammam and 250 in Al-Khobar. The difficulty is not the complexity of one unit but its repetition: an error in a detail multiplies 482 times.
What was delivered
- —Led mechanical design and construction across the units so quality held steady through repetition.
- —Supervised mechanical systems on the Holiday Inn (IHG) in Jubail with zero safety violations.
Outcome
- 482
- Villas delivered
- 10%
- Ahead of schedule
- 98%