Al-Fanar Company
Senior Mechanical Project Engineer / Manager
Tabuk & Taif, Saudi Arabia
Full mechanical scope delivery on high-voltage substations and renewable energy projects aligned with Vision 2030.
Al-Mahani 110/33 kV Substation — SAR 131.4M contract for National Grid SA: led the full mechanical scope (HVAC, firefighting, plumbing), precast concrete adjustments, heavy overhead crane installation, and industrial security systems.
Al-Muwaih Solar PV 380/110 kV BSP & Expansion: 100% Saudi Electricity Company compliance and a 15% reduction in project timelines.
Al-Wessam 110 kV Substation: MEP system coordination, quality control, testing protocols, and welder qualification cards.
NEOM Village Project (Dec 2022 – Jan 2025): managed mechanical construction to 95% completion on schedule and 10% under budget, cutting rework by 20% and lifting team productivity by 15%.
A digital platform and consultancy advancing AI in engineering and construction project management across KSA and the GCC.
Built Alsaba Cloud (alsaba.cloud) — an EVM-based construction analytics and tender analysis platform powered by the Gemini API.
Authored "Artificial Intelligence in Project Management" — an Amazon top seller in its category (Nov 2024).
Designed and launched the Udemy course "Earn Your First 100 Dollars from AI".
Critical Engineering Company
Senior Mechanical Project Engineer
Ras Al Khair, Al-Jubail, Saudi Arabia
Supervised construction of specialized industrial storage tanks to GB standards.
Nine specialized industrial storage tanks with a 100% safety and quality audit compliance rate.
Delivered 10% ahead of schedule and under budget, enabling a 12% overall cost reduction.
Reduced site safety incidents by 15% and raised team efficiency by 18% by mentoring junior engineers.
Fanar Arabian International / Pace Consulting
Senior Mechanical Engineer & HSE Manager
Dammam & Jubail, Saudi Arabia
Led mechanical design and construction for residential and hospitality projects.
482 residential villas (232 in Dammam, 250 in Al-Khobar), completed 10% ahead of schedule with 98% client satisfaction.
Holiday Inn Hotel (IHG, Jubail): 100% on-time milestone completion, 98% quality compliance, and zero safety violations.
Optimized factory machinery operations through targeted preventive maintenance strategies.
Engineering Contracting Office (ECO)
Mechanical Site Engineer
Alexandria, Egypt
Supervised construction of 36-inch oil pipeline infrastructure.